Barrage de Pougma

Barrage de Pougma

Project Description

Client: Awesome Company
Location: Mountain View CA 94043
Surface Area: 450,000 m2
Year Completed: 2014
Value: $250.000
Architect: ECR- BTPI

The Langham Hotel located in Mountain View is one of the most CA’s largest hotel with over 450,000 square feet of new construction. Complete interior renovation included removing walls, new restrooms, paint, wall coverings, tile and carpeting.

The Challenges

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin suscipit convallis facilisis. Fusce lectus ex, pretium efficitur suscipit sed, faucibus vel elit. Sed eu vestibulum leo. Phasellus at quam id elit hendrerit semper feugiat id nunc. Duis semper lacus scelerisque, aliquam leo quis, porttitor leo.

Morbi quis justo velit. Duis semper lacus scelerisque, aliquam leo quis, porttitor leo. Etiam lobortis dapibus libero vel porttitor. Nulla tempor elit nec feugiat tempus.Phasellus at quam id elit hendrerit semper feugiat id nunc. Morbi quis justo velit. Duis semper lacus scelerisque, aliquam leo quis, porttitor leo. Fusce lectus ex, pretium efficitur suscipit sed.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin suscipit convallis facilisis. Fusce lectus ex, pretium efficitur suscipit sed, faucibus vel elit. Sed eu vestibulum leo. Phasellus at quam id elit hendrerit semper feugiat id nunc. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin suscipit convallis facilisis. Fusce lectus ex, pretium efficitur suscipit sed, faucibus vel elit. Sed eu vestibulum leo.

Barrage de Bakata

Description du Projet

Client: MINISTÈRE DE L’AGRICULTURE DES RESSOURCES HYDRAULIQUES, DE L’ASSAINISSEMENT ET DE LA SECURITE ALIMENTAIRE
Lieu: Bakata (Pronince…)
Capacité : 3 400 000 m3, LONGUEUR DE LA DIGUE: 780 ML- LONGUEUR DU DEVERSOIR2
Année de fin: 2015
Value: FCFA
Entreprise: ECR-BTPI

COOPERATION ROYAUME DE SUEDE- BURKINA FASO/ MINISTÈRE DE L’AGRICULTURE DES RESSOURCES HYDRAULIQUES, DE L’ASSAINISSEMENT ET DE LA SECURITE ALIMENTAIRE

PROJET DE REDUCYION DE LA VILNERABILITE DES PETITS BARRAGES AU CHANGEMENT CLIMATIQUE 2010-2015

MAÎTRE D’OUVRAGE DÉLÉGUÉ: AGETEER, MISSION DE CONTÔLE: SAHEL CONSUL// SEGH – ENTREPRISE: ECR- BTP

FINANCEMENT : ROYAUME DE SUEDE/ PERIMETRE HYDRAU AGRICOLE DE TYPE SEMI CALIFORNIEN RÉALISE EN 2015

CAPACITE DE STOKAGE: 3 400 000 m3, LONGUEUR DE LA DIGUE: 780 ML- LONGUEUR DU DEVERSOIR

CENTRAL Y COMPRIS LA PASSE À POISSON: 75 ML LONGUEUR DU DEVERSOIR LATERAL: 80 ML- CARACTERISTIQUES DU PERIMETRE: SUPERFICIE AMENAGEE: 43,32ha. CONDUITE PRINCIPALE EN TUBE PVC PRESSION: 2862,99 ML,
CONDUITE SECONDAIRE EN TUBE DE PVC EVACUATION: 2047,50 ML, CONDUITE TERTIAIRE EN TUBE PVC EVACUATION: 2332,05 ML, BOUCHES D’IRRIGATION: 71 UNITÉS, REGARD DE COMPTAGE (VANNE + COMPTEUR) 8 UNITÉS,
BASSIN DE TRANSFERT D’EAU: 3 UNITÉS, OUVRAGE D’ACCOMPAGNEMENT: 4285 ML DE PISTE, 1 FORAGE, ET 4 LATRINES À 2 POSTES, REBOISEMENT: 24 500 PLANTES
@ PHOTO HYACINTHE C/ BAOBABWEBTV/

Project 11 DECEMBRE BANFORA 2020

Description du Projet

Client:  Ministère des Infrastructure et du Désenclavement
Lieu:  Banfora
Linéaire: 8 630, 127 (ml) route revêtue
Année:   2020
Coût: FCFA
Entrprise:   ECR- BTPI

Rue RB08 : Embr (RN07) Bounouna – côté Nord de la Sofitex Embr(RR21).Rue 8.22 Rue 8.20 et Rue 8.38 – Secteurs 8,9

Rue RB10: Rue longeant côté nord de GMB – côté Ouest du dispensaire du secteur 08(Rue 8-168 et Rue 08-193) – Secteur 8

Rue CF1 (embr. CTOM – Ecole sécondaire – embr. RN7)- Secteur 9

Rue CF2: Rue CF2 (Plateau multi-sport – embr. RN7 – allant vers lieux sacré)- Secteur 9

Rue CF3: Rue CF3 (Espace vert de proximité – embr. RN7 – passant par le centre de loisir et le jardin public)- Secteur 9

Rue CF4: Rue CF4 (DP association – Lycée privé – longeant le jardin public et le centre de loisir jusqu’à la reserve foncière côté Nord)

Rue CF5: Rue CF5 (Embr. RN7 – Unité de production de beurre de karité)

Rue CF6: Rue CF6 (Embr. CF4 – RA – embr. CF3 – passant par l’aire de jeux – Intersection CF4)

 

Morbi quis justo velit. Duis semper lacus scelerisque, aliquam leo quis, porttitor leo. Etiam lobortis dapibus libero vel porttitor. Nulla tempor elit nec feugiat tempus.Phasellus at quam id elit hendrerit semper feugiat id nunc. Morbi quis justo velit. Duis semper lacus scelerisque, aliquam leo quis, porttitor leo. Fusce lectus ex, pretium efficitur suscipit sed, faucibus vel elit

 

Barrage de Seboun

[/vc_column][/vc_row]

Description des travaux

Terrassement, Assainissement, Chaussée, Revêtement en BB et en enduit superficiel, signalisation-sécurité, Protections diverses, plantation d’arbres, Réalisation d’ouvrages hydrauliques

Cient: MINISTÈRE DE L’AGRICULTURE DES RESSOURCES HYDRAULIQUES, DE L’ASSAINISSEMENT ET DE LA SÉCURITÉ ALIMENTAIRE Lieu: Seboun (Burkina Faso (BFA)
Capacité Area: 450,000 m2
Année de fin:   2020
Coût:  FCFA
Entreprise:   ECR- BTPI